泰安工地電梯門套:電梯門套施工方案
電梯門套施工方案
Construction plan for elevator door frames
現(xiàn)在的建筑里面,在建設(shè)的時候都會設(shè)計上電梯。這個時候就會需要用到電梯門套,電梯門套的種類也是有很多種的,一般都是根據(jù)整體的設(shè)計去選擇選用什么樣子的,以及什么材質(zhì)的電梯門套的。今天我們就來了解電梯門套施工方案。
Elevators are often designed during construction in modern buildings. At this point, elevator door frames will be needed, and there are many types of elevator door frames. Generally, the selection of what kind and material to use for elevator door frames is based on the overall design. Today we will learn about the construction plan for elevator door frames.
電梯門套施工方案
Construction plan for elevator door frames
一、石材表面處理,石材表面應(yīng)干燥,含水不大于百分之八。
1、 The surface treatment of stone should be dry, with a moisture content not exceeding 8%.
二、石材安裝前先對石材進行挑選、使用一個門套石材色澤、花紋一致、挑出色差。
2、 Before installing the stone, select the stone and use a door frame to ensure that the color and pattern of the stone are consistent, and identify any color differences.
三、對安裝石材的結(jié)構(gòu)表面清理,放水平線、垂直線。
3、 Clean the surface of the structure for installing stone, and lay out horizontal and vertical lines.
四、用臺鉆打眼、每塊板上、下面打眼,孔位打在板中間。
4、 Drill holes with a table drill, both above and below each board, with the holes located in the middle of the board.
五、用膨脹螺栓把角架固定,再把掛件固定在角架上。
5、 Fix the angle bracket with expansion bolts, and then fix the hanging parts onto the angle bracket.
六、石材開槽,用大理石膠把石材固定在掛件上。
6、 Cut grooves in the stone and fix it onto the pendant with marble glue.
七、立面垂直,光面平整,接縫平直,接縫寬度。
7、 Vertical facade, smooth surface, straight seams, and wide seams.
八、全部安裝完后,要對表面石材一次性清理。
8、 After all installations are completed, the surface stone should be cleaned in one go.
本文由 泰安工地電梯門套 為您精心提供,如想了解更多請點擊我們的網(wǎng)站:http://direguo.cn,我們將會以的熱情為您解答!
This article is carefully provided by the elevator door frame of Tai'an construction site. If you want to learn more, please click on our website: http://direguo.cn We will answer you with the greatest enthusiasm!