電梯門(mén)套工程安裝質(zhì)量要求
1.為了保證企業(yè)的,保證業(yè)主較高質(zhì)量要求,乙方在進(jìn)場(chǎng)后要認(rèn)真配合現(xiàn)場(chǎng)核對(duì)好尺寸,確認(rèn)好圖紙以便生產(chǎn),對(duì)進(jìn)場(chǎng)的成品材料要有程序的去安裝,小心堆放,如因乙方亂堆放造成板材破損,一切損失由乙方負(fù)責(zé)。
1. In order to ensure the brand of the enterprise and the high quality requirements of the owner, Party B should carefully cooperate with the site to check the size and confirm the drawings for production after entering the site. The finished materials entering the site should be installed in a programmed way and stacked carefully. If the plates are damaged due to Party B's random stacking, Party B should be responsible for all losses.
2.在安裝時(shí)要按照?qǐng)D紙(有編號(hào)的板材按編號(hào)安裝),特殊需要調(diào)整的板面由現(xiàn)場(chǎng)安裝人員自行調(diào)整后再安裝,對(duì)不能上墻的板面不要安裝,及時(shí)通知工廠再補(bǔ)。
2. During installation, the plates shall be installed according to the drawings (numbered plates shall be installed according to the number). The plates that need special adjustment shall be installed after being adjusted by the on-site installation personnel. The plates that cannot be installed on the wall shall not be installed, and the factory shall be notified in time to make up.
3.安裝時(shí)每個(gè)墻面的陽(yáng)角、橫豎縫、板面缺角、崩邊等要修補(bǔ)的石材,由安裝工自己在施工中及時(shí)修補(bǔ)好再安裝。每個(gè)墻面完工后,由現(xiàn)場(chǎng)主管檢查驗(yàn)收后,交項(xiàng)目部驗(yàn)收打包(屬于加工錯(cuò)誤,現(xiàn)場(chǎng)不能修補(bǔ)的由工廠派人員修理)。
3. During installation, the stone materials to be repaired, such as external corners, horizontal and vertical joints, missing corners and broken edges of each wall surface, shall be repaired by the installer himself in time during construction before installation. After the completion of each wall, the on-site supervisor shall check and accept it, and then submit it to the project department for acceptance and packaging (if it is a processing error and cannot be repaired on site, the factory shall send professionals to repair it).
4.成品材料到場(chǎng)后,要按照?qǐng)D紙對(duì)照好墻面進(jìn)行安裝,對(duì)因安裝質(zhì)量不合格,圖紙尺寸于墻面不吻合引起返工,重新補(bǔ)板,造成材料損失,一切責(zé)任由乙方承擔(dān)(屬于工廠切割錯(cuò)誤的報(bào)到工廠做調(diào)換)。
4. After the finished materials arrive at the site, the wall shall be installed according to the drawings. Party B shall bear all the responsibilities for the rework caused by the unqualified installation quality and the inconsistent size of the drawings with the wall, and the material loss caused by the re patching of the plates (if the cutting is wrong in the factory, report to the factory for replacement).
以上就是為大家介紹的有關(guān)電梯不銹鋼門(mén)套的詳細(xì)的介紹,希望對(duì)您有所幫助.如果您有什么疑問(wèn)的話,歡迎聯(lián)系我們.我們將以的態(tài)度,為您提供服務(wù)http://direguo.cn
The above is a detailed introduction about the stainless steel door pocket of elevator. I hope it can help you If you have any questions, please contact us We will provide you with professional service http://direguo.cn